Privacy Policy     Terms and Conditions     FAQs                 ©2018 by TransNet NZ Limited. All rights reserved.

POWER
SUPPLY PITS

These pits have been designed to supply multiple EV pedestals.  Essential for future proofing but also for installations of multiple chargers in a network situations like carparking buildings, apartment complexes, commercial premises and the like.

The range includes the pedestal termination pit and the EV charger network main power supply pit.

The EVC-PIT6-KIT can supply up to 6 chargers at full capacity from a single 3-phase supply. The pit is designed to be a complete solution to break-out from larger capacity supply cables to feed EV chargers with the current capacity required while ensuring electrical standards are met. 
The pit features the ability to loop a large supply cable (up to 120mm²) to feed multiple EVC-PIT6-KITs. Up to 6 chargers per pit, with a maximum of 3 pits (max 15 chargers) from a 160A three-phase feeder, or more chargers with load sharing (see Wallbox load sharing capabilities).
EVC-PIT6-KIT is designed for permanent underground termination on walkways, driveways or carparks, allowing for a clean and tidy architectural installation.

POWER SUPPLY PIT

Datasheet

Used to make an easy connection point to daisy chain the supply to multiple EV pedestals. Essential for future proofing and a must for any new car park.  Don’t be caught out by having to do costly re-work when you need to install EV charger pedestals – install this pit wherever there may be a need for EV chargers in the future. Used in conjunction with conduit and either a draw wire or full pre wire, this is the most cost effective way to ensure your carpark is prepared for when more EV charging stations are required.  

PEDESTAL TERMINATION PIT

Datasheet